Banner 330x1440 (Fireplace Right) #1

NamWater, development bank launch N$665-million waterplant project

A project worth N$665 million to address Rundu’s growing water demands and improve infrastructure has been launched.

The Rundu Water Treatment Plant Extension Project is the initiative of the Namibia Water Corporation (NamWater) in partnership with the African Development Bank (AfDB).

It is designed to meet the town’s growing water demands and those of its surrounding communities, ensuring sustainable water supply to meet the anticipated demand by 2037.

The Kavango East region has long faced persistent water supply issues, primarily due to aging raw water abstraction and conveyance systems that no longer meet demand.

Additionally, inefficient water distribution infrastructure has led to frequent supply interruptions, affecting residents, businesses, and institutions.

Minister of agriculture, water, and land reform Calle Schlettwein has reaffirmed the government’s commitment to ensuring water security for all Namibians.

“Access to water is a fundamental right.

This project demonstrates our dedication to closing the gap and ensuring a sustainable water supply for all Namibians.

It is also a reminder of the need for accountability in water payments to sustain NamWater’s operations,” he says.

The project includes several critical upgrades, such as a new raw water abstraction and conveyance system, a modernised water treatment plant, upgrades to existing infrastructure, the decommissioning of outdated systems, and enhanced stormwater and sewerage systems to ensure proper drainage.

These improvements aim to provide a reliable water supply, addressing both the region’s immediate and future needs.

NamWater chief executive Abraham Nehemia has highlighted the project’s significance in fostering economic development and improving living standards.

“This initiative represents a cornerstone of our efforts to ensure water security in Namibia. By providing reliable and high-quality water, we are not only meeting current needs but also laying the groundwork for economic growth and improved living standards,” he says.

Kavango East governor Bonifatius Wakudumo emphasises the broader impact of the project beyond infrastructure development.

“The Rundu Water Treatment Plant Extension Project is more than an infrastructure project; it is a beacon of hope for our communities. It will enhance public health, support education, and drive economic opportunities,” he says.

In an age of information overload, Sunrise is The Namibian’s morning briefing, delivered at 6h00 from Monday to Friday. It offers a curated rundown of the most important stories from the past 24 hours – occasionally with a light, witty touch. It’s an essential way to stay informed. Subscribe and join our newsletter community.

AI placeholder

The Namibian uses AI tools to assist with improved quality, accuracy and efficiency, while maintaining editorial oversight and journalistic integrity.

Stay informed with The Namibian – your source for credible journalism. Get in-depth reporting and opinions for only N$85 a month. Invest in journalism, invest in democracy –
Subscribe Now!


Latest News